Two quotes for the same wall, ten feet tall at its highest point, holding back the cut at the back of a Spokane Valley lot. One of them is a page and a half long and prices block, gravel, drainage and labor. The other is more expensive, includes a line for an engineer and a second line for a soils investigation, and the homeowner wants to know what the second line is buying.
It is a fair question, and the usual answer is unsatisfying. The wall is the same height either way. The block is the same block. If both contractors build something that stands up on the day it is finished, the difference between the two quotes looks like paperwork.
The soils line buys the inputs for the whole design. Most of them are static: what the ground beneath the footing can carry, how much the retained soil pushes, where the water table sits, and whether the material behind the wall is native soil or somebody’s old fill. Those four decide the thickness of the base, the length of the reinforcement and the drainage, and they are the reason an investigation earns its line on a quote even in a place with no earthquake question at all.
Then there is one input that behaves differently from the rest. The site class sets how much of the mapped shaking is amplified on the way up to the wall, and it is the input that cannot be judged reliably by eye — it usually needs data from the lot. A retaining wall holding soil back is loaded by that soil every day of its life, and that part of the design is reasonably predictable from the geometry and the material. An earthquake is a different kind of load, and how much of it arrives at the wall depends on two things: the mapped hazard for the location, and a factor set by the ground the wall stands on. Two identical walls a mile apart, in the same earthquake, can see meaningfully different demand because the ground beneath them amplifies the shaking differently.
That is not a hedge. It is written into the design procedure as a multiplier, and there is one soil classification that removes a wall from the standard procedure altogether and sends it to a site-specific analysis instead.
Spokane is not Seattle, and a low garden wall is not designed around a subduction-zone event. But the question of whether seismic loading was considered at all, and on what assumption about the soil, is worth understanding before signing either quote. It explains why one contractor wants to dig a hole before quoting.
Do I Need Earthquake Design for My Retaining Wall?
The short answer: the soils line pays for the input that sets how much shaking the design assumes, and whether your wall needs a seismic check at all is decided by the building department and the engineer of record. Neither of them is the contractor quoting the job. The jurisdiction decides what needs a permit and a stamped design; the engineer of record decides which load cases that design has to run, seismic among them, whether or not it ever appears as a line on your quote.
This article cannot give you the threshold, and it is worth saying why rather than guessing. None of the documents below governs a residential retaining wall. FHWA NHI-10-024 is written for transportation structures. The Washington residential code section quoted later covers dwellings, not walls. So anyone who tells you a wall is over or under the line is quoting a local rule, and the place to confirm it is the building department that will stamp the permit.
What moves a wall into that territory is a combination of things: how tall it is, whether it is an engineered reinforced soil wall rather than a gravity or segmental wall standing on its own, what sits on the ground above it, and what sits at its toe. A four-foot block wall holding back a flower bed is not the same structure as a ten-foot reinforced wall with a driveway on top of it and a house below.
There is a question worth asking the building department directly, because it has a definite answer and no national document does: which seismic design category has the jurisdiction assigned this address, and does that category require seismic design of a retaining wall? The answer is specific to the address, so it is not something an article can supply.
So the useful question is not “does my wall need earthquake design”. It is “is this wall engineered, and if it is, what did the engineer assume about the ground”. The rest of this explains what that assumption is worth, and why the contractor who wants to dig a hole first is asking for the one input that changes the answer.
An Earthquake Is Not Just a Bigger Version of the Everyday Load
The federal design manual for reinforced soil walls, FHWA NHI-10-024, puts seismic loading in a separate category from the loads a wall carries all the time. It is a November 2009 document whose seismic chapter is built on AASHTO LRFD 2007 with the 2008 and 2009 Interims, so the table numbers and the 1,000-year maps quoted below belong to that edition — current AASHTO editions, and whichever method your engineer has adopted, may differ. FHWA NHI-10-024 is written for transportation structures and does not govern a residential garden wall. A residential wall is designed by the engineer of record, to whichever method the jurisdiction accepts. The manual is used here because it sets out the seismic procedure in public, step by step, which almost nothing else does.
Following AASHTO, it defines an extreme event as one whose recurrence interval can be thought to exceed the design life of the structure, and gives those events their own limit states: Extreme Event I and Extreme Event II.
Seismic events are analyzed under Extreme Event I. Vehicular impact and superflood or scour events fall under Extreme Event II. The distinction matters to a homeowner for a reason that has nothing to do with the arithmetic: a limit state for an event expected to exceed the design life is not asking the wall to shrug the event off undamaged.
The external stability procedure in Section 7.1.1 of that manual is explicitly a displacement based approach. The question it answers is not “will the wall be unaffected” but “how far will it move, and is that acceptable”. Under the manual’s procedure the engineer first checks sliding against the full design acceleration. Only if that check fails does the procedure go on to compute how far the wall would slide and ask whether that movement is tolerable; Step 13 puts typical practice at limiting lateral displacement to the range of 2.0 to 4.0 inches, on the assumption that whatever sits on top of the wall or at its toe can tolerate that much. A reinforced soil wall that moves within its computed limit and then stops is behaving as the design anticipated. One that keeps going is not.
That reframing is worth carrying into the rest of this. The engineer is not trying to make the wall immovable. They are trying to keep its movement bounded, and the thing that most strongly controls how hard it gets pushed is underneath it.
The Procedure Starts With the Ground, Not the Wall
The sequence in Section 7.1.1 is specific about order, and the order is the part most people get backwards.
The static design comes first. Step 1 is to establish an initial wall design based on static loading, drawing on the manual’s Chapter 4, Chapter 5 and Chapter 6 — the ordinary earth pressure, surcharge and stability work. Seismic analysis is a check applied to a wall that already works under everyday conditions. It is not a parallel design, and it does not rescue a wall that was wrong statically.
Then the hazard at that location. Step 2 establishes the seismic hazard from seismic hazard maps with a return period of 1,000 years, per AASHTO Article 3.10.2, producing two site-specific values: the peak ground acceleration, PGA, and the spectral acceleration at a 1-second period, S1. Both are properties of the location, not the wall.
Then the soil underneath. Step 3 establishes the site effects in accordance with AASHTO Article 3.10.3. It calls for a Site Class for the foundation soils, determined under Article 3.10.3.1, and from that site class two site factors: Fpga and Fv, read from AASHTO Tables 3.10.3.2-1 and 3.10.3.2-3.
This is the step the soils line on a quote feeds, and it is worth being precise about what that does and does not promise. A residential geotechnical report may or may not state a site class; nothing we opened says a typical one does, and the building-code route below shows that a default class is often assumed instead. So ask the question directly: will this investigation assign a site class, and by what method? An investigation that returns bearing capacity and a friction angle and nothing else has still answered the seismic question — by assumption.
Site class is a description of the soil profile beneath the structure, running from hard rock at one end to soft and problematic deposits at the other. Nothing about the wall affects it. It is a property of the lot, and it is determined by going and looking at what is down there.
Site Class F Is the Line Worth Knowing About
Here is the sentence in that procedure that changes a project, and it is short.
The method described in the manual is applicable to Site Classes A, B, C, D and E. For all sites in Site Class F, the manual states that site-specific geotechnical investigations and dynamic site response analysis should be performed.
Read that as a homeowner rather than an engineer. For five of the six site classes the manual gives published tables and a short set of equations. For the sixth, the standard route is closed, and the ground has to be investigated and its response modeled specifically for that site.
Site Class F covers the soil profiles that do not behave predictably under shaking — the ones where the usual assumptions about how ground motion passes through soil stop holding. Whether a particular lot falls there is a question for a geotechnical engineer with data from that lot, and it is not answerable from a map, a neighbor’s experience or an article.
What this means practically is that the soils investigation is not only producing a bearing capacity and a friction angle for the static design. It is answering a prior question: can this wall be designed from tables at all, or does it need something more? A quote that includes no investigation has answered that question by assumption.
What the Soil Factor Does to the Number
Step 4 is where the site class turns into load. Two equations, and the first one is the one to remember:
kmax = Fpga (PGA) — Equation 7-1
The maximum acceleration used in the design is the peak ground acceleration at that location multiplied by Fpga, the site factor that came out of the site class. The earthquake supplies PGA. The soil supplies Fpga. The product is what the wall is designed against.
That is the whole argument for the soils line on the quote, in one line of algebra. Two walls on the same street in the same event share a PGA and can carry different values of kmax, because Fpga is not the same for both. The ground does not merely transmit the shaking; it modifies it on the way up, and softer profiles generally modify it upward.
The companion equation produces a velocity rather than an acceleration:
PGV (in/sec) = 38 Fv S1 — Equation 7-2
where Fv is the second site factor from Step 3 and S1 is the 1-second spectral acceleration from Step 2.
Peak ground velocity is worth following, because it is where the displacement argument at the top of this article turns into a number. If the sliding check fails, Step 9 works out the wall’s yield seismic coefficient, ky — the acceleration at which sliding starts. Step 10 then puts ky/kmax, kmax and PGV into the equation that estimates d, the wall’s sliding displacement in inches, with one form for sites in the Western United States and a second for rock sites in the Central and Eastern United States. That inch figure is what Step 13 compares against the 2.0 to 4.0 inch tolerance quoted earlier. PGV is not a curiosity in the procedure; it is one of the three inputs to how far the wall is expected to move.
Neither number is something a contractor can reasonably eyeball, which is the point. They come from a hazard map and a soil classification, and the classification is the one that depends on data from the lot rather than from a published map. Our guide to Spokane Valley’s glacial outwash soils covers what the ground around here actually turns out to be once somebody looks.
What Those Factors Look Like in Spokane Valley
Abstract multipliers are easy to wave away, so here are real ones. The USGS publishes a building-code seismic design web service that returns mapped values for a given latitude and longitude. Asked for a point near the middle of Spokane Valley — 47.6732, -117.2394 — at Risk Category II and the default soil classification, against ASCE 7-16, it returns:
| Quantity | Value |
|---|---|
| PGA, mapped peak ground acceleration | 0.14 |
| Fpga, the site factor at Site Class D | 1.519 |
| PGA adjusted for site effects | 0.213 |
| S1, 1-second spectral acceleration | 0.112 |
| Fv, the 1-second site factor | 2.377 |
| Seismic design category | C |
Look at the first three rows together, because that is Equation 7-1 doing its work on a real lot. The mapped acceleration is 0.14. The soil factor at Site Class D is 1.519. Multiply them and the building-code design acceleration comes out at 0.213 — the soil has added about 52 percent to the number before the wall is even considered. Read these figures as an illustration of what site class does to a number, not as the inputs to a wall design: an engineer working to the FHWA procedure takes PGA and S1 from AASHTO’s 1,000-year maps rather than from the building-code service used here.
That is the answer to “what is the soils investigation buying”. It is not a rounding adjustment. On this soil classification it is half again as much acceleration, and a different classification would give a different factor. Run the second equation on the same values and the peak ground velocity comes out near 10 inches per second: 38 multiplied by an Fv of 2.377 and an S1 of 0.112.
One more detail from that output is worth pulling out, because it shows how the category is arrived at. The service returns a seismic design category of B when derived from the short-period response and C when derived from the 1-second response, and reports the governing category as C — the more severe of the two. A single letter on a drawing is the outcome of two separate checks, and the harsher one wins.
An important caution about mixing these numbers up. The values above are the building-code route, computed against ASCE 7-16. The wall procedure in Chapter 7 reads its PGA and S1 from AASHTO’s maps at a return period of 1,000 years, which is a different hazard basis. The two sets of numbers are not interchangeable, and an engineer designing a wall to the AASHTO procedure will not be using the figures in that table. What transfers between them is the structure of the problem, not the values: a mapped hazard for the location, multiplied by a factor that comes from the soil.
They also assume Site Class D, because that is what the service was asked for — and the Washington code makes the same default assumption in its own maps, which is worth coming back to once the rest of the procedure is clear.
Height Enters the Calculation Twice
Step 5 adjusts kmax to an average acceleration across the reinforced soil zone, because a tall wall does not experience peak acceleration everywhere at once:
kav = α kmax — Equation 7-3
For Site Classes C, D and E, the manual gives α from Equation 7-4 as a function of the wall height H in feet at the wall face, together with Fv, S1 and kmax. For Site Class A and B foundation conditions — hard and soft rock — the values of α from that equation should be increased by 20 percent.
Two statements in Step 5 matter here:
- For walls less than approximately 20 feet in height on very firm ground conditions, meaning Site Class B or C, the manual says kav is approximately equal to kmax. The height-averaging refinement is not worth chasing.
- For wall heights greater than 100 feet, site-specific geotechnical investigations and dynamic site response analysis should be performed — the same exit as Site Class F, reached by height instead of soil. That threshold is not a residential concern; it is quoted here only because it shows the procedure has an upper bound as well as a lower one.
Note what that first one actually requires. The manual’s statement that kav is approximately kmax applies to walls under about 20 feet on very firm ground, Site Class B or C. The Spokane Valley figures in the table above assume Site Class D, and nothing establishes a site class for a particular lot until somebody investigates it. So if the investigation comes back B or C, a ten-foot wall sits inside that simplification. On Site Class D the fuller expression still applies. Either way the expense is finding out which site class you have.
When Is a Slope Stability Model Needed Behind a Retaining Wall?
The rest of the procedure is arithmetic your engineer runs, and only one part of it changes what a project costs. Step 6 computes the total static-plus-dynamic thrust on the wall by hand, and the manual then does something unusual for a design document: it explains where its own equation fails.
A steep backslope can produce no solution at all. For backfills sloped at 3H:1V or steeper, the manual notes it may not be possible to obtain a solution for certain combinations of variables. And the formulation assumes a simpler soil than many sites have — it is strictly applicable to homogeneous cohesionless soils, and may not yield realistic solutions for soils deriving shear strength from both cohesion and friction, for non-uniform backslope profiles, or for complex surface loadings.
Where that happens the manual sends the engineer to a generalized limit equilibrium slope stability analysis instead, with the earth pressure applied as a boundary force and the load adjusted until the capacity-to-demand ratio reaches 1.0.
That is worth knowing for one reason. If an engineer looking at a hillside lot says the hand calculation will not do the job and they need to run a slope stability model, that is not padding. It is the manual’s own instruction for a steep or layered site, and a hillside lot behind a wall is exactly the geometry that triggers it.
Step 7 then adds the inertia of the wall mass itself, and Step 8 checks sliding using a resistance factor of 1.0, with the full nominal weight of the reinforced zone. A resistance factor of 1.0 is itself a statement about the limit state: under an extreme event the design leans on the material’s nominal strength rather than holding a reserve against it.
What Does the Washington Residential Code Say About Seismic Design and Site Class?
A reader who goes looking for their own answer will probably end up at the Washington State Residential Code, and it is worth understanding what they will find there, because it is less than they expect and more interesting than they expect.
The code’s climatic and geographic design criteria table, Table R301.2, has a seismic design category entry. The footnote against it reads, verbatim: “The jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1.” The code does not print the answer for your address. It instructs the local jurisdiction to fill it in. For a specific lot, the authoritative seismic design category comes from the building department with authority over that lot, not from a national document.
Section R301.2.2 then sets out where the residential seismic provisions bite, naming Seismic Design Categories C, D0, D1 and D2, with a separate section, R301.2.2.1.2, for an alternative determination of Seismic Design Category E. Those provisions govern dwellings and townhouses. A freestanding retaining wall tall enough to need engineering is not a dwelling, and nothing in that section designs it — but the category tells you what seismic environment the jurisdiction considers your lot to be in, which is useful background to a conversation with an engineer.
Note where that leaves the Spokane Valley figures above, because the two routes to a category do not return the same letter. R301.2.2 applies the residential seismic provisions to townhouses in Categories C, D0, D1 and D2, but to detached one- and two-family dwellings only in D0, D1 and D2 — so which letter you are holding matters.
The USGS service reports C as the governing category because it takes the more severe of the short-period and 1-second results. The residential code reads the category from the short-period value alone: Table R301.2.2.1.1 assigns the category from calculated SDS, and its bands run SDS ≤ 0.17g for A, 0.17g < SDS ≤ 0.33g for B, and 0.33g < SDS ≤ 0.50g for C. The SDS at that Spokane Valley point is 0.323, which falls in the B band. So on these figures the residential-code route puts a townhouse outside R301.2.2 as well as a detached house — the opposite conclusion from the one the governing C would suggest.
Which is the point worth taking away rather than either letter. The category that governs a real lot is the one the building department has filled in, by the route it has adopted, for that address.
Then there is the assumption buried in the figure notes, which reframes everything above it.
The short-period design spectral response accelerations shown in Figures R301.2.2.1(1) through R301.2.2.1(6) — the maps the seismic design category is read off — are, in the code’s own words, “based on soil Site Class D, used as an assumed default,” as Site Class D is defined in Section 1613.2.2 of the International Building Code.
The map-based answer that a homeowner or a contractor is most likely to reach for has a soil class already baked into it, chosen as a default rather than measured. If the real profile under a particular wall is stiffer than Site Class D, the default is conservative. If it is softer, or if it turns out to be Site Class F, the default is not conservative, and the map was not claiming otherwise. The code is transparent about this; it is simply in a figure note.
This is the cleanest way to answer the homeowner holding two quotes. The cheaper quote may rest on no seismic check at all, or on a default assumption about the soil. Nothing on the page tells you which. The more expensive one proposes to go and find out. That is the question worth asking out loud.
What an Engineer Actually Works Through, in Order
Laid out as a sequence, the reinforced-wall seismic check runs roughly like this:
- A static design that stands on its own, from geometry, soil strength and surcharge.
- The seismic hazard at the location: PGA and S1 from the 1,000-year return period maps.
- The site class from the foundation soils, and from it the site factors Fpga and Fv — including the threshold question of whether Site Class F takes the project off the standard route.
- kmax from Equation 7-1, and PGV from Equation 7-2.
- The height-averaged acceleration kav, which on a sub-20-foot wall on firm ground is approximately kmax anyway.
- The total thrust PAE, by Mononobe-Okabe where the geometry and soil allow it, and by a slope stability model where they do not.
- The inertial force of the reinforced mass itself, and the sliding check.
Steps 1 and 3 supply the inputs that every later calculation depends on.
Our engineered retaining wall and design and permitting pages cover what a stamped design includes and where it becomes necessary.
Four Things That Go Wrong on Quotes
Treating the soils investigation as optional paperwork. It is the input to Step 3, and Step 3 is the input to every number after it. Without it the design either adopts a default site class or inherits one from a map note, and neither is a measurement of the lot.
Assuming a short wall means no engineering question. Height is only one of the triggers. A modest wall on a poor soil profile is a more interesting engineering problem than a tall one on rock, and the site class does not care how tall the wall is.
Comparing two quotes as though they describe the same scope. A quote with no investigation and no stamped design is cheaper because it contains less, not because the contractor found efficiencies. Whether the missing part is necessary depends on the height, the geometry, what is above and below the wall, and what the jurisdiction requires.
Forgetting that the backslope is part of the design. Ground that keeps rising steeply behind a wall is a different problem from ground that levels into a bench, and at 3H:1V or steeper it is one of the geometries where the standard seismic earth pressure equation may return no solution at all. If your lot looks like that, expect the engineering to take longer. If your wall is being built in tiers up the slope, the interaction between them is its own question — our guide to tiered wall spacing covers how the offset decides whether you built one wall or two.
What Drives the Cost
There is no meaningful single price for this work without knowing the wall height, the length, the slope above and below it, what the wall supports, the jurisdiction’s requirements and what the soil investigation finds. A seismic design quoted before the site class is known rests on an assumed class, and the quote should say which one.
The variables that actually move the number:
- Wall height and length, which set whether engineering is required at all and how much structure is involved.
- What the investigation finds. A good site class keeps the seismic check routine. A difficult profile can require a site-specific response analysis, which is a different order of work.
- The backslope and what sits above the wall. A steep or loaded backslope can push the analysis from a hand calculation to a slope stability model.
- Jurisdiction, since the seismic design category and the submittal requirements come from the local building department.
Before You Commit to Either Quote
Three questions, in this order, will tell you more than any amount of comparison shopping:
“What site class did you assume, and how do you know?” If the answer is a measured classification from an investigation on this lot, the design has a real input. If the answer is a default, that is not necessarily wrong — but you now know what you are buying, and you can decide whether to buy the investigation instead.
“What seismic design category has the jurisdiction filled in for this address?” That is a question with a definite answer, held by the building department, and the code explicitly directs you there.
“Will this wall need a stamped design, and who is deciding that?” Height, loading and local requirements determine it. A contractor who treats the answer as obvious without reference to any of those has not checked.
The sequence that saves money on a wall like this is unglamorous: find out what the ground is before designing anything, get the static design right, and let the seismic check be the short calculation it usually is on a firm site. Doing it the other way round — designing the wall, pricing it, then discovering the soil — is where retaining wall projects get expensive, and the discovery arrives after the money has been committed.
If you are weighing an engineered wall against a simpler one and want to understand which parts of the cost are structural necessity and which are assumption, that is a conversation worth having before the excavator arrives.
A note on sources. FHWA NHI-10-024 is a design manual for mechanically stabilized earth walls, written for transportation structures rather than residential projects, and it does not govern a garden wall. It is referenced here because it is the document that sets out the seismic design procedure for reinforced soil walls in plain, numbered steps. The procedure applies to geosynthetic-reinforced soil walls; whether a given residential segmental wall is designed to it is the engineer’s decision, and our guide to geogrid reinforcement covers what that reinforced zone is and does. A gravity block wall or a boulder wall with no reinforced zone behind it is a different structure and this procedure is not the one that describes it.
This guide explains the process in plain language and is not engineering advice. A licensed engineer’s determination for a specific property, and the current requirements of the jurisdiction with authority over it, control what is actually required.
Sources
- FHWA NHI-10-024, Design and Construction of Mechanically Stabilized Earth Walls and Reinforced Soil Slopes, Volume I, November 2009. Chapter 7 for the definition of an extreme event as one whose recurrence interval can be thought to exceed design life, and for the assignment of seismic events to the Extreme Event I limit state with vehicular impact and superflood or scour events under Extreme Event II; Section 7.1 for the statement that the seismic guidance presented is based on Anderson et al. (2008) and Kavazanjian (2009) and represents updated procedures to those in AASHTO (2007), and for the footnote that the AASHTO 4th Edition 2007 including the 2008 and 2009 Interims applies and that the 2008 Interims contain significant seismic revisions; and Section 7.1.1 for the displacement based approach and its numbered steps — the initial static design in Step 1, the 1,000-year return period hazard maps giving site PGA and the 1-second spectral acceleration S1 per AASHTO Article 3.10.2 in Step 2, the site effects per Article 3.10.3 including Site Class per Article 3.10.3.1 and the site factors Fpga and Fv from AASHTO Tables 3.10.3.2-1 and 3.10.3.2-3 in Step 3, the applicability of the procedure to Site Classes A, B, C, D and E with site-specific geotechnical investigations and dynamic site response analysis for all sites in Site Class F, Equation 7-1 kmax = Fpga(PGA) and Equation 7-2 PGV (in/sec) = 38FvS1 in Step 4, the wall-height dependent reduction factor and Equation 7-3 kav = α kmax in Step 5 with Equation 7-4 for Site Classes C, D and E and the 20 percent increase in α for Site Class A and B foundation conditions, the statement that for walls less than approximately 20 ft in height on very firm ground conditions (Site Class B or C) kav is approximately kmax and that for wall heights greater than 100 ft site-specific investigations and dynamic site response analysis should be performed, the Mononobe-Okabe formulation of Equation 7-5 with KAE from Equation 7-6 in Step 6 together with the assumption that the vertical seismic coefficient is zero and the horizontal coefficient equals kmax and that PAE acts at mid-height, the two comments on the formulation’s limits covering backfills sloped at 3H:1V or steeper and its strict applicability to homogeneous cohesionless soils rather than c-phi soils, non-uniform backslope profiles or complex surface loadings, the referral to the Culmann and Coulomb trial wedge methods and to Method 2 generalized limit equilibrium with Spencer’s method and the h/3 to 2h/3 application points and a capacity:demand ratio of 1.0, Equation 7-7 PIR = 0.5(kav)(W) in Step 7, and the sliding check of Step 8 using a resistance factor equal to 1.0 and the full nominal weight of the reinforced zone. Also Step 9 for the determination of the wall yield seismic coefficient ky at which sliding is initiated; Step 10 for the determination of the wall sliding displacement d in inches from the relationships between d, ky/kmax, kmax and PGV, given as Equation 7-8 for Western United States soil and rock sites and Central and Eastern United States soil sites and Equation 7-9 for Central and Eastern United States rock sites, with the boundary between the two regions given by Figure 7-4; and Step 13 for the assessment of the acceptability of the sliding displacement d, which states that the tolerable amount depends on the nature of the wall and what it supports and puts typical practice at limiting displacement to the range of 2.0 in. (50 mm) to 4.0 in. (100 mm) assuming that structures on top or at the toe of the wall can tolerate such displacements.
- USGS Seismic Design Web Service, ASCE 7-16 values for latitude 47.6732, longitude -117.2394. Queried for Risk Category II and Site Class D against reference document ASCE7-16, this returns for that Spokane Valley point a mapped peak ground acceleration PGA of 0.14, a site factor Fpga of 1.519 and a site-adjusted PGA of 0.213; a 1-second spectral acceleration S1 of 0.112 with a site factor Fv of 2.377; short-period values SS of 0.313 and Fa of 1.55; design spectral response accelerations SDS of 0.323 and SD1 of 0.177; a seismic design category of B derived from the short-period response and C derived from the 1-second response; and a governing seismic design category of C. The peak ground velocity figure of about 10 inches per second quoted in the article is the product of those returned values in Equation 7-2 of FHWA NHI-10-024 rather than a value the service itself reports, and the article notes that these ASCE 7-16 values are a different hazard basis from the AASHTO 1,000-year return period maps the wall procedure uses.
- 2021 Washington State Residential Code, Chapter 3, Building Planning, Section R301. Table R301.2 for the footnote directing that “the jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1”; Section R301.2.2 for the seismic provisions applying to Seismic Design Categories C, D0, D1 and D2 and for their application to townhouses and to detached one- and two-family dwellings; Section R301.2.2.1.2 for the alternative determination of Seismic Design Category E; Table R301.2.2.1.1, “Seismic Design Category Determination”, for the assignment of the category from calculated SDS alone, whose bands read SDS ≤ 0.17g for A, 0.17g < SDS ≤ 0.33g for B and 0.33g < SDS ≤ 0.50g for C; and the note to Section R301.2.2.1 for the statement that the short-period design spectral response accelerations S-DS shown in Figures R301.2.2.1(1) through R301.2.2.1(6) “are based on soil Site Class D, used as an assumed default,” as defined in Section 1613.2.2 of the International Building Code.